top of page
التوحيد العربى (6).jpg

Catalog

التوحيد العربى لصناعة المواسير  (7).jpg
UPVC pipe installation instructions
  • The tail of the pipe is inserted into the head and a circular mark is placed to determine the overlap distance between the head and the tail.

  • Chamfer the end of the pipe with a suitable file, especially in the case of cutting pipes at the work site.

  • The head and tail of the pipe must be cleaned well with a piece of clean dry cloth.

  • The adhesive should be shaken with a suitable brush in one direction on the tail of the pipe and inside the head

  • The tail is inserted into the head of the pipe at the full overlap distance specified by the mark on the tail of the pipe, taking into account not to move the pipe in a circular direction.

  • The line is tested after 24 hours

  • The adhesive package must not be left open so as not to be exposed to dehydration.

bottom of page